CQV strategy for a new pharmaceutical laboratory

The brief
Consider a new pharmaceutical facility installing a laboratory. Its sterility test isolator, cold storage and analytical instruments each have different dependencies. Planning starts with the intended use of each asset, the date the laboratory needs it and the work that must be complete before testing can begin.
Engineering approach
Our CQV lead owns the qualification plan and integrated schedule. The team agrees responsibilities with Engineering, the laboratory, Quality and equipment vendors, then sequences field execution against installation and utility readiness.
Sterility test isolator
27 controlled temperature units
Analytical equipment
CQV leadership and scheduling
Delivery and handover
At handover, the laboratory needs a clear status for each asset: what was tested, where the evidence is held and which open items restrict use. Operations and Quality can then make the release decision against the site’s procedures.
Explore our CQV services or discuss a laboratory installation.